The truth is Michael that I have actually been under the Metrolink vehicles looking as how to mount equipment under the high (“BR’ standard) floor, at that visit batteries were discussed using the same technology as in the battery powered ex underground trains.
In one of the offices it showed proposed routes. One of which was the ELR, I did common it and the reply was Metrolink during the week and steam at the weekends.
With the ELR and Metrolink having a direct connection the idea is not just a pipe dream.
Other Railway Adventures
Report
There was a problem reporting this post.
Block Member?
Please confirm you want to block this member.
You will no longer be able to:
See blocked member's posts
Mention this member in posts
Invite this member to groups
Message this member
Add this member as a connection
Please note:
This action will also remove this member from your connections and send a report to the site admin.
Please allow a few minutes for this process to complete.